Answer
Jun 10, 2025 - 08:23 AM
We don't have a video for this, but it is pretty straight forward. The salt cell and flow switch will need to be installed in a section of Schedule 40 PVC pipe with 6-12 inches of pipe ahead of the flow switch to smooth the waterflow. On both ends of the PVC section, you connect to the flex hose with this adapter kit.
It is okay for the cell to sit on the ground, if you choose to do so.
It is okay for the cell to sit on the ground, if you choose to do so.
Add New Comment